PREPARATION FOR USE:
No unusual preparations are required to ready the High Line Dock for use. The dock is ready for use upon completion of assembly from the "as received" condition. 

 DOCK COMPONENTS REQUIRED:
The following components make up a completed High Line Dock. 
​  

 TOOLS:
The following standard hand tools are required for the assembly/ disassembly of the High Line Dock. These tools are included with each dock and are located within the storage bin. For faster assembly / disassembly, use an air ratchet if available. 


Wrench, open ended 2 ¼" - 1ea. 
Wrench, 2 way lug, 3/4", 15/16", 6 Pt. - 1ea. 
Nylon twine - 1ea. 
Level - 1ea. 
Hole alignment tool - 1ea. 


1. SELECT SETUP LOCATION 

A) A CONCRETE OR BLACKTOP SURFACE IS REQUIRED FOR PROPER SETUP. THE SURFACE SHOULD HAVE NO MORE THAN 2 INCHES OF UNEVENNESS FOR BEST RESULTS. THE SURFACE SHOULD BE FREE OF DAMAGE TO INSURE THAT THE FOOT PADS DO NOT DEPRESS INTO THE SURFACE. NOTE: THE HLD IS DESIGNED TO SLIDE IF STRUCK BY A HEAVY VEHICLE WHILE LOADING OR UNLOADING THE DOCK. IT IS IMPORTANT THAT THE FOOT PADS ARE NOT CONSTRAINED FROM SLIDING IN ANY WAY. 

2. UNPACKING PROCEDURES 

A) HIGH LINE DOCK MODELS 545, 546, AND 547, ARE SHIPPED ON TWO SKIDS. THESE SKIDS REQUIRE AT LEAST TWO PEOPLE AND A FORK LIFT TO UNLOAD. NOTE: USE EXTREME CAUTION WHEN UNLOADING THE SKIDS. SOME PIECES ARE CONCEALED WITHIN OTHERS AND MAY NOT BE SEEN AT FIRST GLANCE. 

B) USING A 4K FORKLIFT UNLOAD THE SKID WHICH CONTAINS THE CONVEYORS. PLACE ALL PARTS THAT LOOK ALIKE IN SEPARATE PILES. LEAVE THE CONVEYORS ON THE SKID. 

C) NOW, USING A 4K FORKLIFT, UNLOAD THE SKID WHICH CONTAINS THE SUPPORTS. STAND THE SUPPORTS UPRIGHT ON THEIR FOOT PADS. PLACE ALL PIECES THAT LOOK ALIKE IN SEPARATE PILES. UNLOAD THIS SKID COMPLETELY. 

3. SETTING UP SUPPORTS 

A) USING A 4K FORKLIFT RAISE THE SUPPORTS OFF THE GROUND AND ADJUST THE FOOT PADS (ITEM 1) ALREADY LOCATED IN THE SUPPORTS (ITEM 2) TO THE DESIRED HEIGHT. (NOTE: THE TOP OF THE BOTTOM NUT ON THE FOOTPAD MUST BE SET A MINIMUM OF 4 INCHES ABOVE THE PLATE. THIS WILL MAKE THE DOCK HEIGHT 45 ¼ INCHES). SNUG BUT DO NOT TIGHTEN FOOT PAD NUTS. 

B) PLACE ALL 7 SUPPORTS (ITEM 2) APPROXIMATELY 8 FT. APART FROM EACH OTHER IN THE DESIRED SETUP LOCATION.


C) CONNECT THE REMAINING SUPPORTS (ITEM 2) TOGETHER USING HORIZONTAL BRACES (ITEM 3) AND HORIZONTAL BRACE ENDS (ITEMS 3B AND/OR 3C DEPENDING ON MODEL). HORIZONTAL BRACE ENDS HAVE TWO HOLES ON ONE END. THESE HOLES WILL ALIGN WITH THE TWO BOTTOM HOLES LOCATED ON THE END SUPPORT LEGS. HORIZONTAL BRACES (ITEM 3) WILL GO IN BETWEEN THE TWO END SECTIONS OF THE DOCK. USING THE BOTTOM HOLES LOCATED ON THE SUPPORT LEGS, BEGIN AT ONE END OF THE DOCK AND SECURE THE HORIZONTAL BRACES AND HORIZONTAL BRACE ENDS USING 5/8 INCH BOLTS AND NUTS (ITEM 18). SNUG BOLTS BUT DO NOT TIGHTEN.


D) (MODEL 546 ONLY) AT THIS TIME YOU MUST DETERMINE WHICH END YOU WILL POSITION THE SPECIAL SIDE ENTRY END SECTION. LOCATE THE TWO HORIZONTAL BRACES THAT ARE 10" LONGER THEN THE OTHER BRACES. USE THESE TWO BRACES TO CONNECT THE SUPPORTS WHERE THE SIDE ENTRY IS TO BE. 

E) RUN A PIECE OF NYLON TWINE FORM THE LEG OF ONE END SUPPORT (ITEM 2) TO THE LEG ON THE OTHER END SUPPORT (ITEM 2). MAKE SURE ALL 7 SUPPORT LEGS TOUCH THE TWINE. THIS WILL INSURE THE DOCK IS STRAIGHT. FINE TUNING WILL BE DONE AT A LATER TIME. 

F) USING DIAGONAL BRACES (ITEM 4) TIE THE SUPPORTS INTO THE CENTER OF THE HORIZONTAL BRACE ENDS (ITEMS 3B AND/OR 3C DEPENDING ON MODEL) AND HORIZONTAL BRACES (ITEM 3). THE NOTCHED END OF THE DIAGONAL BRACES (ITEM 4) WILL ALWAYS CONNECT TO THE TOP HOLES OF THE SUPPORT LEGS, AND THE NOTCHED END WILL ALWAYS FACE DOWN. BEGIN AT ONE END OF THE DOCK AND WORK YOUR WAY AROUND. YOU WILL START WITH THE TOP INSIDE HOLE ON THE END SUPPORT AND YOU WILL FINISH WITH THE TOP INSIDE HOLE ON THE OTHER END OF THE DOCK. USE 5/8 INCH BOLTS AND NUTS TO CONNECT THE PIECES. SNUG BOLTS BUT DO NOT TIGHTEN.


4. INSTALLING END SECTION CONVEYORS AND WALKWAYS 

A) USING TWO MEN AND A FORK LIFT, SLIDE FOUR END CONVEYORS ONTO THE FORKS OF THE FORK LIFT. NOTE: END SECTION CONVEYORS (ITEMS 5B AND/OR 5C DEPENDING ON MODEL) HAVE YELLOW STOP MECHANISMS. PLACE CONVEYOR ENDS (ITEMS 5B AND/OR 5C) ON THE END SECTIONS OF THE DOCK. THE STOP END OF THE CONVEYOR WILL SET FULLY ON THE END SUPPORT. NOTE: THE FOUR OUTER HOLES LOCATED ON THE TOP OF THE SUPPORTS WILL BE USED TO SECURE THE GUIDE RAILS LATER IN THE INSTALLATION PROCESS. DO NOT USE THESE HOLES TO CONNECT CONVEYORS. 

B) USING 1/2 INCH BOLTS AND NUTS, (ITEM 19) BOLT DOWN ONE OF THE OUTSIDE CONVEYOR END SECTIONS (ITEMS 5B AND/OR 5C DEPENDING ON MODEL) TO THE SUPPORTS (ITEM 2) LEAVING THE OTHER 3 CONVEYOR END SECTIONS FREE TO SLIDE. SNUG BUT DO NOT TIGHTEN. 

C) WORKING FROM THE CONVEYOR END SECTION (ITEM 5B AND/OR 5C DEPENDING ON MODEL) YOU JUST BOLTED DOWN, SLIDE THE NEXT CONVEYOR END SECTION TO ALLOW FOR INSTALLATION OF STOP CONNECTOR TUBE (ITEM 16) AND WALKWAY INSIDE END (ITEMS 7B AND/OR 7C DEPENDING ON MODEL). 

D) PLACE 1 STOP CONNECTOR TUBE (ITEM 16) OVER THE STOP SHAFT OF THE CONVEYOR END SECTION (ITEM 7B AND/OR 7C) YOU JUST BOLTED DOWN. SECURE STOP CONNECTOR TUBE TO STOP SHAFT WITH 1 SQUARE SNAP PIN (ITEM 27). 


E) PLACE WALKWAY INSIDE END (ITEMS 7B AND/OR 7C DEPENDING ON MODEL) ON BOTTOM OF 4 INCH CHANNEL FLANGE OF CONVEYOR END SECTION (ITEMS 5B AND/OR 5C DEPENDING ON MODEL) YOU JUST BOLTED DOWN. SLIDE THE CONVEYORS TOGETHER MAKING SURE THAT THE STOP CONNECTOR TUBE (ITEM 16) SLIDES OVER THE STOP SHAFT AND THE TWO CONVEYOR ENDS (ITEMS 5B AND/OR 5C DEPENDING ON MODEL) SUPPORT THE WALKWAY (ITEMS 7B AND/OR 7C DEPENDING ON MODEL). USE 1/2 INCH BOLTS AND NUTS TO SECURE THE CONVEYOR END SECTION TO THE SUPPORT. SNUG BUT DO NOT TIGHTEN. USE A SQUARE SNAP PIN (ITEM 27) TO SECURE THE STOP CONNECTOR TUBE (ITEM 16) TO THE STOP SHAFT.


F) REPEAT STEPS (D AND E) UNTIL ALL SIX WALKWAYS (ITEMS 7B AND/OR 7C DEPENDING ON MODEL), ALL SIX STOP CONNECTOR TUBES (ITEM 16), AND ALL EIGHT CONVEYOR END SECTIONS (ITEMS 5B AND 5C DEPENDING ON MODEL) ARE BOLTED AND SECURED IN PLACE. SNUG BUT DO NOT TIGHTEN. AFTER COMPLETION OF THESE STEPS, BOTH END SECTIONS SHOULD BE SET UP. 

5. INSTALLING REGULAR CONVEYORS 

A) SLIDE FOUR OF THE 16 REMAINING REGULAR CONVEYORS (ITEM 5) ONTO THE FORKS OF THE FORK LIFT AND PLACE THEM ON TOP OF THE SUPPORTS (ITEM 2). USE 1/2 INCH BOLTS AND NUTS TO SECURE THE REGULAR CONVEYORS (ITEM 5) TO THE SUPPORTS (ITEM 2). SNUG BUT DO NOT TIGHTEN. REPEAT THIS PROCESS UNTIL ALL 16 REGULAR CONVEYORS HAVE BEEN INSTALLED. REMEMBER THAT THE OUTER FOUR HOLES ON TOP OF THE SUPPORTS WILL BE USED TO INSTALL THE GUIDE RAILS LATER IN THE INSTILLATION. 

6. INSTALLING INSIDE WALKWAYS 

A) TO INSERT THE 12 INSIDE WALKWAYS (ITEM 7), REST ONE EDGE OF THE INSIDE WALKWAY ON THE BOTTOM 4 INCH CHANNEL FLANGE OF THE REGULAR CONVEYOR (ITEM 5) AND LET THEM FALL INTO PLACE 

7. INSTALLING GUIDE RAIL 

A) PLACE 1 GUIDE RAIL RH END (ITEMS 6B AND/OR 6D DEPENDING ON MODEL) AND ONE GUIDE RAIL LH END (ITEMS 6C AND/OR 6E DEPENDING ON MODEL) ON EACH END OF THE DOCK. FLARES OF GUIDE RAILS FACE OUT AND AWAY FROM THE DOCK. USE 1/2 INCH BOLTS AND NUTS TO SECURE THE GUIDE RAILS IN PLACE. SNUG BUT DO NOT TIGHTEN. 

B) SET THE REMAINING 8 GUIDE RAILS (ITEM 6) INTO PLACE. USE 1/2 INCH BOLTS AND NUTS TO SECURE THE GUIDE RAILS AS THEY ARE PUT INTO PLACE. SNUG BUT DO NOT TIGHTEN. 

8. CHECK DOCK FOR ALIGNMENT AND LEVELNESS 

A) VISUALLY ALIGN GUIDE RAILS FOR STRAIGHTNESS AND ADJUST AS NEEDED. 

B) VISUALLY LEVEL THE CONVEYOR SECTIONS BY SIGHTING DOWN THE ROLLER SECTIONS FOR LEVELNESS. FOOT PAD NUTS CAN BE ADJUSTED AT THIS TIME TO ADJUST THE LEVELNESS OF THE DOCK. YOU MAY ALSO USE THE LEVEL AND NYLON TWINE TO HELP AID IN LEVELING THE DOCK. NOTE: DOCK MUST BE STRAIGHT AND LEVEL FOR PALLETS AND CARGO TO ROLL EFFICIENTLY ON THE ROLLER DECK. 

C) WHEN THE DOCK IS STRAIGHT AND LEVEL, BEGIN TO TIGHTEN BOLTS. NOTE: TIGHTEN ALL BOLTS AT THIS POINT. BEGIN AT ONE END OF THE DOCK AND WORK TO THE OTHER END. DO NOT TURN THE NUTS!! TURN THE BOLTS. TIGHTEN FOOT PAD NUTS AT THIS TIME. 

9. INSTALL STOP LEVERS 

A) INSTALL STOP LEVERS (ITEMS 15 AND 15B) TO THE END OF THE STOP SHAFTS ON EACH END OF THE DOCK USING A SQUARE SNAP PIN (ITEM 27). USE THE ALUMINUM STOP LEVER EXTENSION TUBE (ITEM 28) TO AID IN THE LOWERING OF THE STOPS. THE ALUMINUM STOP LEVER EXTENSION TUBE IS REMOVABLE TO PREVENT A TRIPPING HAZARD ON THE DOCK. 

10. INSTALLING OUTSIDE WALKWAY SUPPORT 

A) PLACE THE 24 OUTSIDE WALKWAY SUPPORTS (ITEM 9) INTO THE ROUND SOCKETS LOCATED ON THE SIDES OF THE SUPPORT LEGS. MAKE SURE THAT THE OUTSIDE WALKWAY SUPPORTS GO ALL THE WAY THROUGH THE SOCKETS AND HITS THE HORIZONTAL BRACE ENDS (ITEMS 3, 3B AND 3C DEPENDING ON MODEL).


11. INSTALLING OUTSIDE WALKWAYS 
A) START AT ONE END OF THE SUPPORTS (ITEM 2) AND CONNECT THE OUTSIDE WALKWAYS (ITEMS 8 AND/OR 8B DEPENDING ON MODEL) USING 5/8 X 5 INCH CLEVIS PIN (ITEM 21). USE HAIR PIN (ITEM 23) TO SECURE THE CLEVIS PINS IN PLACE. NOTE: CLEVIS PINS (ITEM 21) WILL HOLD TWO OUTSIDE WALKWAYS (ITEMS 8 AND/OR 8B DEPENDING ON MODEL) IN PLACE EXCEPT ON THE VERY ENDS OF EACH DOCK.


12. INSTALLING LADDERS 

A) LADDERS (ITEM 13) MAY BE ATTACHED TO ANY SECTION OF THE DOCK EXCEPT THE TWO END SECTIONS.


B) SECURE LADDER TO OUTSIDE WALKWAY USING 1/2 INCH BOLTS AND NUTS. SECURE BOTTOM OF LADDER TO HORIZONTAL BRACE USING LADDER CLIPS (ITEM 14) AND 3/8" BOLTS AND NUTS. (ITEM 20) 



13. SECURING HAND RAIL SUPPORT TUBES 

A) SECURE THE HAND RAIL SUPPORT TUBES (ITEMS 11 AND 11B) TO THE OUTSIDE WALKWAYS (ITEMS 8 AND/OR 8B DEPENDING ON MODEL) BY INSERTING A HITCH PIN (ITEM 25) THROUGH THE HOLE LOCATED IN THE SQUARE SOCKETS ON THE OUTSIDE WALKWAYS. NOTE: THIS WILL PREVENT THE HAND RAILS FROM LIFTING OUT OF PLACE.


14. INSTALLING GUIDE RAIL INSERT (MODELS 546 AND 547 ONLY) 

A) WHEN THE SIDE ENTRY ACCESS IS NOT BEING USED, PLACE THE YELLOW GUIDE RAIL INSERT (ITEM 29) INTO THE OPENING. THIS WILL PREVENT THE PALLETS FROM STRIKING THE GUIDE RAIL IF THE PALLETS GETS SKEWED.